BUILDING SAFETY DIVISION

Commercial & Multi-Family Code References

  • 2021 International Building Code
  • 2021 International Existing Building Code
  • 2021 International Mechanical Code
  • 2021 International Fuel Gas Code
  • 2021 International Fire Code
  • 2021 International Swimming Pool and Spa Code
  • 2020 National Electrical Code (NFPA 70)
  • 2014 Illinois Plumbing Code
  • 2018 Illinois Accessibility Code
  • 2021 Illinois Energy Conservation Code

Code books may be purchased directly from International Code Council.  Code and commentary books are also available for viewing at the Champaign Public Library. Code amendments are available online.

Permit Application/Plans Submittal

Submit application with four (4) complete sets of plans and specifications (including all MEPs and site plans). If an alteration and there is no change to exterior dimensions of the building and no site changes, submit three (3) complete sets.

Commercial And Multi-Family Code Checklist

Following are the most common omissions/errors made by design professionals on plan submittals accompanying permit applications. Failure to provide the listed information creates plan review delays that may result in added cost to all concerned. Please help to expedite your plan review by providing the following information:
Commercial and Multi-Family Code Checklist

Estimated Plan Review Time

Ten (10) business days from receipt of all material. Plan review time is subject to application and plans being complete and in compliance with all codes and ordinances.  Subsequent reviews are five (5) business days.

Commercial and Multi-Family Permit Plan Review Process

The applicant starts and finishes the permit process at the same location. Commercial & Multi-Family permits are processed simultaneously by three City departments in order to make the process more efficient. When a permit applications are submitted to the Building Safety Division at the Champaign Fire Department, they are routed to the individual reviewers that need to review the particular application. The applicant and/or design professional will be contacted by the individual reviewers with questions and comments. The plans and review process are constantly tracked by permitting software which can be monitored by the applicant online. All departments welcome the chance to review particular portions of applications prior to their formal submission in order to make the permitting process proceed smoothly.

commercial-and-multi-family

Commercial and Multi-Family Permit Review Process                        (click image to enlarge)                                                                             Note: Other reviews may be necessary depending on the scope of the project.

Permit Fees

New and addition building permit fees are based on the Permit Fee Schedule. The plan review fee is based on the building volume. There is a 1.5 multiplier for MEP reviews and certain types of permits.

Alteration building permit fees are $6 per $1,000 of construction costs. The plan review fee is .005 x construction costs for alterations over $20,000. Construction costs do not include MEP costs.

See links below for current permit fees and Permit Fee Schedule.
Permit fees are nonrefundable.

Permit Fees
Permit Fee Schedule

No fee is required with the building permit application. Building Safety will calculate the fee during the plan review process. Permit fees are due when the permit is issued.  Current Fees and Permit Fee Schedule are also available at the Building Safety office.

Inspections

Required inspections are noted on the permit.
We request 24 hours notice to schedule inspections.

217-403-6100
Inspector’s Office Hours
7:00 – 8:00 am and 3:00 – 4:00 pm