Sixth Street Road Closure
In order to install a storm sewer connection at 519 E. Green Street, Broeren Russo and Mid-Illinois Concrete will close Sixth Street between Green Street and John Street on: • Monday, June 30 – Wednesday, July 2, 2014 During this closure, through traffic will not be allowed in the area, but the contractor will accommodate […]
Fourth Street Lane Closure
In order to install water services for the new high-rise building at 308 East Green Street, Mid-Illinois Concrete will be closing one lane of Fourth Street between Healey Street and Green Street. The closure will begin on Monday, June 16, 2014, at 7 a.m. and will reopen by Friday, June 20, 2014, at 4 p.m. […]
Sixth Street Road Closures
Champaign – In order to install electric feeds and to remove the tower crane at 519 East Green Street, Broeren Russo and Mid-Illinois Concrete will close Sixth Street between Green Street and John Street on two occasions: • Monday, March 24, 2014 – Sunday, March 30, 2014 (Electric Installation) • Tuesday, April 1, 2014 – Wednesday, April 2, […]