As part of the City’s 2015 Concrete Street Maintenance Project, the pavement on Mayfair Road from Lincolnshire Drive to Broadmoor Drive is being rehabilitated. The City’s contractor for the project, Stark Excavating, will continue work Monday, July 6, 2015, weather permitting.
Mayfair Road will temporarily be a one lane, one-way street northbound from Broadmoor Drive to Lincolnshire Drive. Flaggers will be provided as needed to help direct traffic.
This work involves replacing deteriorated sections of pavement with new concrete pavement, sidewalk repairs, and lawn restoration.
Please pay close attention to construction signs, traffic control devices and marked detours. Please do not park on the street near the construction site or in areas that are posted “No Parking.” Please proceed cautiously through construction zones and use alternate routes whenever possible. The contractor will attempt to complete construction activities as soon as possible to minimize any inconvenience to the residents in the areas of construction.
The City of Champaign would like to thank you for your cooperation and patience during this construction season. A map showing this location along with all 2015 City Engineering Division projects can be found at www.ci.champaign.il.us/pwd, click on “2015 Construction Maps” under “Timely Topics.”