The project removes damaged pavement (potholes) and replaces it with full-depth concrete pavement. Feutz Contractors started work on the project March 31, 2014. Feutz has already completed work at four locations: Devonshire Drive between Lakeside Drive and Sandpiper Lane; Broadmoor Drive between Mayfair Road and Robert Drive; Harrington Drive between O’Donnell Drive and Robert Drive; and Devonshire Drive at Robert Drive. Feutz is currently working on Hessel Boulevard between Prospect Avenue and Elm Blvd.; State St. from William Street to Hessel Boulevard; and Prospect Avenue from Devonshire Drive to Windsor Road. A total of 94 patches have been completed with a total of 1,800 square yards.