Annual Paving Project (Fair Street)

Starting Wednesday, September 23, 2015, Cross Construction Company will begin pavement patching work on Fair Street from White Street to Park Street. There will be intermittent lane closures throughout the construction period; however, one lane will be open to local traffic. The street will be limited to one-way traffic, and access to driveways will be limited at times. The contractor will notify residents of the times their driveways will not be accessible. Work is scheduled to be completed by October 9, 2015.
The City of Champaign would like to thank you for your cooperation and patience during this construction season. A map showing this location along with all 2015 City Engineering Division projects can be found atwww.ci.champaign.il.us/, click on the “Maps” link, then on “Construction Map.”