Items tagged: Temporary Road Closure

Southwood Drive Temporary Road Closure (between Southwood Court and Clover Lane)

As part of the 2025 Infrastructure Maintenance project, Feutz Contractors will be placing new asphalt surface for resurfacing near the culvert on Southwood Drive between Southwood Court and Clover Lane.  This work will require a temporary road closure on Friday, September 12, until Noon. Access to all adjacent residences will remain open.


Market Street Temporary Road Closure (between Olympian Drive and Ford Harris Road)

As part of the 2025 Infrastructure Maintenance project, Feutz Contractors will be patching pavement on portions of North Market Street between Olympian Drive and Ford Harris Road.  This work will require a temporary road closure starting Monday, September 15, at 6 a.m. until the afternoon of Friday, September 19, 2025. Access to all adjacent properties […]