2015 Concrete Street Maintenance Project – Mayfair Road
As part of the City’s 2015 Concrete Street Maintenance Project, the pavement on Mayfair Road from Broadmoor Drive to Theodore Drive will be patched. The City’s contractor for the project, Stark Excavating, will begin work on Monday, July 20, 2015, weather permitting. Please pay close attention to construction signs, traffic control devices and marked detours. […]
2015 Concrete Street Maintenance Project – Mayfair Road
As part of the City’s 2015 Concrete Street Maintenance Project, the pavement on Mayfair Road from Lincolnshire Drive to Broadmoor Drive is being rehabilitated. The City’s contractor for the project, Stark Excavating, will continue work Monday, July 6, 2015, weather permitting. Mayfair Road will temporarily be a one lane, one-way street northbound from Broadmoor Drive […]
2015 Concrete Street Maintenance
Holiday Drive Stark Excavating has completed all concrete work on Holiday Drive from Frank Drive to William Street. The work consisted of removal and replacement of a large portion of the existing pavement, curb and gutter replacement and sidewalk repairs. Lawn restoration will be completed later this fall. Stark completed the work on Holiday Drive […]
2015 Concrete Street Maintenance Project – Mayfair Road
As part of the City’s 2015 Concrete Street Maintenance Project, the pavement on Mayfair Road from Lincolnshire Drive to Broadmoor Drive will be rehabilitated. The City’s contractor for the project, Stark Excavating, will begin work on Monday, June 15, 2015, weather permitting. Mayfair Road temporarily will be a one-lane, one-way street southbound from Lincolnshire Drive […]
Infrastructure Maintenance Project
Feutz Contractors have finished construction of the new sidewalk along Galen Drive between Broadmoor Drive and Theodore Drive as part of the sidewalk gap portion of the project. Several residents in the area have commented positively regarding the new sidewalk. As part of this project we were able to include new sidewalk at Fire Station […]
Infrastructure Maintenance Projects
Feutz Contractors has started construction on the Infrastructure Maintenance Project and are working in three locations. Location 1 – Feutz is constructing new sidewalk on both sides of Galen Drive between Broadmoor Drive and Theodore Drive as part of the sidewalk gap portion of the project. Location 2 – Feutz has started repairing sidewalk and […]
Broadmoor Drive Road Closure
In order to repair pavement failures, Feutz Contractors will be closing the east bound lane of Broadmoor Drive between Mayfair Road and Robert Drive. The closure will begin on Monday, March 31, 2014, and will reopen on Friday, April 11, 2014. East-bound traffic will not be allowed in the construction area. Properties with driveways along […]