Items tagged: sanitary

Green Street Lane Closure

In order to install a sanitary sewer service connection for the new high-rise building at 308 East Green Street, Mid-Illinois Concrete will be closing one lane of Green Street, between Third Street and Fourth Street. The closure will begin on Monday, July 14, 2014, at 7 a.m. and will reopen by Wednesday, July 23, 2014, […]


Green Street Road Closure

In order to install new sanitary sewer connections at 519 E Green and at 524 E Green Street, Mid-Illinois Concrete will be closing all lanes of Green Street between Fifth Street and Sixth Street on: ·         Monday, July 7 – Friday, July 11, 2014 These connections require excavations into the middle of the street from the […]


Green Street Road Closure

In order to install new sanitary sewer connections at 519 E Green and at 524 E Green Street, Mid-Illinois Concrete will close all lanes of Green Street between Fifth Street and Sixth Street on:  Monday, July 7 – Friday, July 11, 2014 These connections require excavations into the middle of the street from the north […]